
OPENAI: I WANT ENOUGH POWER TO FRY EARTH! ORACLE: DEAL! OpenAI is asking Oracle for 4.5 gigawatts of energy (that’s “Back to the Future” levels of power) to run more of their massive AI projects. Several U.S. states are being considered to host these mega Stargate sites, so get
